Skip to content

50 First Avenue, Maroochydore

ADAMS + SPARKES are part of the team who have assisted Walker Corporation in bringing together this commercial development which is a key piece of the Maroochydore CBD puzzle.  This development will be constructed over fifteen (15) storeys, and would be the first to achieve a high-rise built form that maximises the height allowance offered within the Maroochydore City Centre PDA, representing the first true high-rise built form in the City Centre. As at time of construction commencement (Aug 2023), 50 First Avenue holds the approval for the tallest budling in the CBD.

50 First Avenue represents the single most sophisticated contribution to the commercial office market in the Sunshine Coast Region, and will achieve 5 Star Greenstar and 5 Star NABERS Energy credentials with such elements as rainwater harvesting tanks, solar panels, options for natural ventilation rather than mechanical air conditioning, provision of regenerative drive systems in lifts to redirect excess energy for use elsewhere in the building and Australian first Automated Pneumatic Waste Collection System.

Project Team
Landscape:
Engineering:

WSP

Traffic:
Back to All Projects
Back To Top